Gold Line Charging Infrastructure
Sector: Automotive • Location: Saint Paul, Minnesota, United States of America
Source: Dodge USA
The work of this project includes : The Gold Line BRT will operate (5) 60-foot Battery Electric Buses out of the East Metro garage with revenue service beginning in 2025. This project will include all necessary work to install owner-furnished contractor installed (OF/CI) switchgear and charging systems, including four charger cabinets, and eight dispensers in the bus storage area at East Metro gar
- Status
- Closed
- Sector
- Automotive, Energy Storage, Mass Transit, Car parking, Power Generation (CCGT), Government, Commercial
- Location
- Saint Paul, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Gold Line Charging Infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work of this project includes : The Gold Line BRT will operate (5) 60-foot Battery Electric Buses out of the East Metro garage with revenue service beginning in 2025. This project will include all necessary work to install owner-furnished contractor installed (OF/CI) switchgear and charging systems, including four charger cabinets, and eight dispensers in the bus storage area at East Metro garage. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Saint Paul |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Energy Storage, Mass Transit, Car parking, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
