Golden Eagle Park Drainage Improvements - Phase 1
Sector: Car parking • Location: Fountain Hills, Arizona, United States of America
Source: Dodge USA
The Project is generally located within Golden Eagle Park as depicted by the Project Design Documents. The Work includes earthwork for open channels, loose and grouted riprap erosion protection, concrete curb, gutter, and sidewalk, fabrication and installation of concrete structures, concrete block masonry walls, handrails, debris racks, sediment gage, drain with backflow prevention, landscape, ir
- Status
- Closed
- Sector
- Car parking, Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial), Government, Automotive, Commercial, Raw Materials
- Location
- Fountain Hills, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Golden Eagle Park Drainage Improvements - Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project is generally located within Golden Eagle Park as depicted by the Project Design Documents. The Work includes earthwork for open channels, loose and grouted riprap erosion protection, concrete curb, gutter, and sidewalk, fabrication and installation of concrete structures, concrete block masonry walls, handrails, debris racks, sediment gage, drain with backflow prevention, landscape, irrigation, electrical and other miscellaneous work as required by the Project Design Plans and Spe... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Fountain Hills |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial), Government, Automotive, Commercial, Raw Materials |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
