Golden Hill Road Repairs
Sector: Car parking • Location: Paso Robles, California, United States of America
Source: Dodge USA
Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as Golden Hill Road Repairs from Creston Road to Rolling Hills, DPW Project No. 23-23, The work shall include, but is not limited to, curb ramp upgrades, lowering and raising of utilities, monument perpetuation, cold planning of existing material, placing HMA base c
- Status
- Closed
- Sector
- Car parking, Power Transmission, Road, Commercial, Government, Automotive, Power Generation (CCGT)
- Location
- Paso Robles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Golden Hill Road Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as Golden Hill Road Repairs from Creston Road to Rolling Hills, DPW Project No. 23-23, The work shall include, but is not limited to, curb ramp upgrades, lowering and raising of utilities, monument perpetuation, cold planning of existing material, placing HMA base course and surface course, pavement striping and markings, all as shown on the plans and/or as spe... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Paso Robles |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Road, Commercial, Government, Automotive, Power Generation (CCGT) |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
