Golden Pacific Powerlink Transmission Line
Sector: Energy • Location: San Diego, California, United States
Source: Sempra
San Diego Gas & Electric Company (SDG&E) will build, own, and operate a new 500-kV electric transmission line between the Imperial Valley Substation and the border of San Diego and Orange Counties. The project aims to reduce congestion costs, improve grid resiliency, modernize the energy grid, integrate more clean energy, and expand access to resources in the Imperial Valley and the Southwest.
- Status
- Prospective
- Sector
- Energy
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Sempra
ConstructChat
Ask ConstructChat about Golden Pacific Powerlink Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | San Diego Gas & Electric Company (SDG&E) will build, own, and operate a new 500-kV electric transmission line between the Imperial Valley Substation and the border of San Diego and Orange Counties. The project aims to reduce congestion costs, improve grid resiliency, modernize the energy grid, integrate more clean energy, and expand access to resources in the Imperial Valley and the Southwest. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Sempra |
URL |
More Details
Record type | Project |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
