logo

Golden Pheasant Wastewater Treatment Plant - Upgrade, Optimization and rehabilitation of Preliminary and Secondary Treatment processes

Sector: Waste Processing and Treatment • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

To address aging infrastructure, and effluent quality issues , and to ensure cost effective operations, the District has a long term strategy to decommission the existing Huntsville Mountview Wastewater Treatment Plant (WWTP) (which does not meet Federal or Provincial Regulations) , and divert all Huntsville flows to the Golden Pheasant WWTP. This project will initiate the first phase of this lon

Project Information FAQ

Project Information

3 Q
The project “Golden Pheasant Wastewater Treatment Plant - Upgrade, Optimization and rehabilitation of Preliminary and Secondary Treatment processes” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

To address aging infrastructure, and effluent quality issues , and to ensure cost effective operations, the District has a long term strategy to decommission the existing Huntsville Mountview Wastewater Treatment Plant (WWTP) (which does not meet Federal or Provincial Regulations) , and divert all Huntsville flows to the Golden Pheasant WWTP. This project will initiate the first phase of this long term strategy which is to upgrade the Golden Pheasant WWTP in preparation for accepting additional flows. The Golden Pheasant WWTP projects includes the following components: Upgrades to a septage receiving system to replace a dysfunctional system and enable monitoring of the load received to protect the treatment plant performance and reliability. Replacement of the existing jet aeration system with a fine bubble aeration system, to rehabilitate an aging system and improve reliability and efficiency. Modification and extension of the existing biological reactor to provide ability to reliably nitrify and produce a non-toxic effluent with respect to ammonia (to comply with provincial requirements), and to provide a de-nitrification cell to enhance energy efficiency and alkalinity recovery, to minimize the need for alkalinity addition to meet effluent pH criteria. Addition of a new chemical building and system for alkalinity addition to top up alkalinity (that cannot be fully recovered through denitrification) and reliability meet effluent pH criteria. Addition of a waste activated sludge (WAS) thickening facility to provide sludge management capacity at Golden Pheasant WWTP that will be required to accommodate Mountview WWTP flows. This approach is significantly lower cost than expanding anaerobic digester capacity that will otherwise be required.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data