Goldendale Energy Storage Project
Planned · Washington · Last reported Mar 2025
Source: KIMA
The Goldendale Energy Storage Project is a $2 billion pumped storage hydropower facility designed to deliver clean energy and create thousands of jobs in Washington state. It aims to generate over 3,000 construction jobs and 60 permanent operational positions while revitalizing the former Columbia Gorge aluminum smelter site.
- Status
- Prospective
- Sector
- Hydro, Steel, Metal, Energy Storage
- Location
- Goldendale, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- KIMA
ConstructChat
Ask ConstructChat about Goldendale Energy Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Goldendale Energy Storage Project is a $2 billion pumped storage hydropower facility designed to deliver clean energy and create thousands of jobs in Washington state. It aims to generate over 3,000 construction jobs and 60 permanent operational positions while revitalizing the former Columbia Gorge aluminum smelter site. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Goldendale |
Source
Source | KIMA |
URL |
More Details
Record type | Project |
Sector | Hydro, Steel, Metal, Energy Storage |
Article published date | 2025-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
