Goldfield Project Development and Construction
The owner, status and timeline of this project. A free account opens every field.
Source: GlobeNewswire
Goldfield project in Nevada, USA, has completed a technical study confirming robust project economics with an after-tax NPV of $245 million and IRR of 30%. The project has an initial capital cost estimated at $252 million, including pre-production stripping and other costs, with first production targeted by the end of 2028. Early mobilization and engineering are progressing as planned.
- Status
- Under Construction
- Sector
- Metal
- Location
- Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- GlobeNewswire
ConstructChat
Ask ConstructChat about Goldfield Project Development and Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Goldfield project in Nevada, USA, has completed a technical study confirming robust project economics with an after-tax NPV of $245 million and IRR of 30%. The project has an initial capital cost estimated at $252 million, including pre-production stripping and other costs, with first production targeted by the end of 2028. Early mobilization and engineering are progressing as planned. |
Original sector | Mining |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | GlobeNewswire |
URL |
More Details
Record type | Project |
Sector | Metal |
Article published date | 2025-10-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project