Golfinho Boost Project
Planned · Brazil · Last reported Apr 2025
Source: Brazil Energy Insight
The Golfinho Boost project aims to increase uptime, reduce operating expenses, and add approximately 3,000 barrels per day of incremental oil production from 2027 at the Golfinho field offshore Brazil. It includes upgrades to the subsea boosting system and other measures to enhance production efficiency and recoverable reserves.
- Status
- Prospective
- Sector
- Oil and Gas
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- Brazil Energy Insight
ConstructChat
Ask ConstructChat about Golfinho Boost Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Golfinho Boost project aims to increase uptime, reduce operating expenses, and add approximately 3,000 barrels per day of incremental oil production from 2027 at the Golfinho field offshore Brazil. It includes upgrades to the subsea boosting system and other measures to enhance production efficiency and recoverable reserves. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | Brazil Energy Insight |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-04-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
