Golovnaya 240-Megawatt Hydropower Plant Rehabilitation Project
Sector: Water Supply and Storage • Location: Tajikistan
Source: Asian Development Bank (ADB)
The proposed Project will increase supply of renewable energy to national and regional power systems. The Project will refurbish electric and mechanical equipment for power generation at Golovnaya Hydropower Plant (HPP) in Tajikistan. This will increase availability of year-round clean power for domestic sales and for export to Afghanistan. The Project will increase the generation capacity and ope
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed Project will increase supply of renewable energy to national and regional power systems. The Project will refurbish electric and mechanical equipment for power generation at Golovnaya Hydropower Plant (HPP) in Tajikistan. This will increase availability of year-round clean power for domestic sales and for export to Afghanistan. The Project will increase the generation capacity and operational efficiency of the power plant. The total installed generation capacity of Tajikistan is 5,055 MW. A large share of hydro generation (98%) is impacted by hydrology fluctuation and results in summer surplus and winter deficit. The power assets in Tajikistan have aged beyond their economic life. The maintenance has been kept at insufficient level due to non availability of spare parts and lack of funding at the vertically integrated state power utility Barki Tojik. The power sector regional master plan, prepared in 2012 under the Central Asian Regional Economic Cooperation (CAREC), identified that nearly 80% of all generation and transmission assets in the country need to be replaced in order to meet the demand and eliminate winter deficit. The master plan identified rehabilitation of Golovnaya HPP as a priority generation project. ADB Country Partnership Strategy 2010-2014 defines the rehabilitation of existing hydro power plants as one of the key areas for intervention. The reliable and secured operation of the large generation plant and high voltage transmission network is equally important for reliability of interconnected neighboring grid and is a prerequisite for power tradeThe impact of the Project will be increased supply of renewable energy to national and regional power systems from 743 GWh in 2012 to 1,130 GWh in 2026. The Project outcome will be increased weighted average generation efficiency of the power plant from maximum 83% to 89%. The Project output will be rehabilitated Golovnaya HPP with generation capacity increased from 240 MW to 252 MW. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
