The proposed Project will increase supply of renewable energy to national and regional power systems. The Project will refurbish electric and mechanical equipment for power generation at Golovnaya Hydropower Plant (HPP) in Tajikistan. This will increase availability of year-round clean power for domestic sales and for export to Afghanistan. The Project will increase the generation capacity and ope

Project Information FAQ

Project Information

5 Q
The project “Golovnaya 240-Megawatt Hydropower Plant Rehabilitation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Tajikistan. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed Project will increase supply of renewable energy to national and regional power systems. The Project will refurbish electric and mechanical equipment for power generation at Golovnaya Hydropower Plant (HPP) in Tajikistan. This will increase availability of year-round clean power for domestic sales and for export to Afghanistan. The Project will increase the generation capacity and operational efficiency of the power plant. The total installed generation capacity of Tajikistan is 5,055 MW. A large share of hydro generation (98%) is impacted by hydrology fluctuation and results in summer surplus and winter deficit. The power assets in Tajikistan have aged beyond their economic life. The maintenance has been kept at insufficient level due to non availability of spare parts and lack of funding at the vertically integrated state power utility Barki Tojik. The power sector regional master plan, prepared in 2012 under the Central Asian Regional Economic Cooperation (CAREC), identified that nearly 80% of all generation and transmission assets in the country need to be replaced in order to meet the demand and eliminate winter deficit. The master plan identified rehabilitation of Golovnaya HPP as a priority generation project. ADB Country Partnership Strategy 2010-2014 defines the rehabilitation of existing hydro power plants as one of the key areas for intervention. The reliable and secured operation of the large generation plant and high voltage transmission network is equally important for reliability of interconnected neighboring grid and is a prerequisite for power tradeThe impact of the Project will be increased supply of renewable energy to national and regional power systems from 743 GWh in 2012 to 1,130 GWh in 2026. The Project outcome will be increased weighted average generation efficiency of the power plant from maximum 83% to 89%. The Project output will be rehabilitated Golovnaya HPP with generation capacity increased from 240 MW to 252 MW.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data