Gonzales Center Pool Renovation Project
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
The work consists of, but not limited to, furnishing all necessary labor,materials, equipment and other incidental and appurtenant work necessary tosatisfactorily complete the Project. The project involves the removal andreplacement of existing plaster of the interior of the pool, replacing all thetile, repair /replace all coving as needed and replace all handrails includingthe zero-depth entry ra
- Status
- Closed
- Sector
- Government, Manufacturing (Industrial), Commercial
- Location
- Colton, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Gonzales Center Pool Renovation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of, but not limited to, furnishing all necessary labor,materials, equipment and other incidental and appurtenant work necessary tosatisfactorily complete the Project. The project involves the removal andreplacement of existing plaster of the interior of the pool, replacing all thetile, repair /replace all coving as needed and replace all handrails includingthe zero-depth entry ramp handrails |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Colton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
