logo
ProjectUnder Construction

Goodnight Data Center Campus

Sector: Wind • Location: Armstrong County, Texas, United States

Source: WIRED

The Goodnight data center campus in Armstrong County, Texas, funded by Google, will be partly powered by private natural gas turbines emitting over 4.5 million tons of greenhouse gases annually. The campus includes six buildings, with the first four connected to the electric grid and the last two powered by an on-site gas plant. The campus also includes 265 megawatts of wind power. The data center

Status
Under Construction
Sector
Wind, Natural Gas, Power Transmission, Power Generation (CCGT), Data Center
Location
Armstrong County, Texas, United States of America
Updated
22 Jul 2026
Source
WIRED

ConstructChat

Ask ConstructChat about Goodnight Data Center Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Goodnight Data Center Campus” is an infrastructure initiative in the Wind sector, located in Armstrong County, Texas, United States. Taiyo aggregates data on it from WIRED.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Goodnight data center campus in Armstrong County, Texas, funded by Google, will be partly powered by private natural gas turbines emitting over 4.5 million tons of greenhouse gases annually. The campus includes six buildings, with the first four connected to the electric grid and the last two powered by an on-site gas plant. The campus also includes 265 megawatts of wind power. The data center construction began in May by AI infrastructure company Crusoe, with Google joining the project as part of a $40 billion AI investment in Texas.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Texas

City

Armstrong County

Source

Source

WIRED

URL

More Details

Record type

Project

Sector

Wind, Natural Gas, Power Transmission, Power Generation (CCGT), Data Center

Article published date

2026-04-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project