logo

Goodwill Headquarters Expansion

Sector: Bridge • Location: Portland, Oregon, United States of America

Source: Dodge

Project
Closed

The project will include the construction of a parking garage with offices above, with a skybridge connecting to the existing office building. The proposed two-story building be approximately 28,000 square feet and will consist of a first floor parking area and second floor office area with sky bridge connecting to the retail area- scope of work currently bidding: DESIGN BUILD SUBCONTRACTORS Plumb

Status
Closed
Sector
Bridge, Power Generation (CCGT), Car parking, Residential, Automotive, Commercial
Location
Portland, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Goodwill Headquarters Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Goodwill Headquarters Expansion” is an infrastructure initiative in the Bridge sector, located in Portland, Oregon, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will include the construction of a parking garage with offices above, with a skybridge connecting to the existing office building. The proposed two-story building be approximately 28,000 square feet and will consist of a first floor parking area and second floor office area with sky bridge connecting to the retail area- scope of work currently bidding: DESIGN BUILD SUBCONTRACTORS Plumbing Mechanical Electrical Fire Suppression- end scope of workbidding- All other scopes of work wi...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Portland

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Power Generation (CCGT), Car parking, Residential, Automotive, Commercial

Article published date

2025-08-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project