logo

Google Stillwater Data Center Building 6

Sector: Water Supply and Storage • Location: Stillwater, Oklahoma, United States of America

Source: Dodge

Project
Pre-Design

The proposed development consists of up to six phases. Each developed phase will include a data center comprised of approximately 300,000 square feet, together with certain ancillary buildings, structures and infrastructure that support or are related to the data center campus operations, including but not limited to, utility buildings, structures, and appurtenances and office buildings.

Status
Prospective
Sector
Water Supply and Storage, Data Center, Waste Processing and Treatment, Airport, Road, Residential, Commercial, Power Transmission, Power Generation (CCGT)
Location
Stillwater, Oklahoma, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Google Stillwater Data Center Building 6

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Google Stillwater Data Center Building 6” is an infrastructure initiative in the Water Supply and Storage sector, located in Stillwater, Oklahoma, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed development consists of up to six phases. Each developed phase will include a data center comprised of approximately 300,000 square feet, together with certain ancillary buildings, structures and infrastructure that support or are related to the data center campus operations, including but not limited to, utility buildings, structures, and appurtenances and office buildings.

Budget

Location

Country

United States of America (USA)

State

Oklahoma

City

Stillwater

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Data Center, Waste Processing and Treatment, Airport, Road, Residential, Commercial, Power Transmission, Power Generation (CCGT)

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project