Goose Pond Dam Replacement and Refilling
Sector: Hydro • Location: Canaan, New Hampshire, United States
Source: Valley News
The project involves the replacement of the dam at Goose Pond and the subsequent refilling of the pond, which has been lowered for repairs. The New Hampshire Department of Environmental Services is preparing to begin refilling the 625-acre pond after significant repairs were made to the dam, which was originally built in 1918.
- Status
- Under Construction
- Sector
- Hydro, Water Supply and Storage
- Location
- Canaan, New Hampshire, United States of America
- Updated
- 22 Jul 2026
- Source
- Valley News
ConstructChat
Ask ConstructChat about Goose Pond Dam Replacement and Refilling
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the replacement of the dam at Goose Pond and the subsequent refilling of the pond, which has been lowered for repairs. The New Hampshire Department of Environmental Services is preparing to begin refilling the 625-acre pond after significant repairs were made to the dam, which was originally built in 1918. |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Canaan |
Source
Source | Valley News |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage |
Article published date | 2025-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
