GOPDC
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
Ghana Oil Palm Development Company Limited (GOPDC) was established by the Government of Ghana (GoG) in 1975 and is today a leading oil palm plantation and processing company in Ghana. GOPDC produces Crude Palm Oil (CPO) and Crude Palm Kernel Oil (CPKO) mainly for the domestic market.The land status of GOPDC as of the end of March 2007 is a Kwae Nucleus estate of 3,670.38 ha, a smallholder project
- Status
- Closed
- Sector
- Water Supply and Storage, Wind, Education, Government, Power Generation (CCGT), Oil and Gas, Commercial, Raw Materials, Manufacturing (Industrial)
- Location
- Ghana
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about GOPDC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ghana Oil Palm Development Company Limited (GOPDC) was established by the Government of Ghana (GoG) in 1975 and is today a leading oil palm plantation and processing company in Ghana. GOPDC produces Crude Palm Oil (CPO) and Crude Palm Kernel Oil (CPKO) mainly for the domestic market.The land status of GOPDC as of the end of March 2007 is a Kwae Nucleus estate of 3,670.38 ha, a smallholder project of 540.3 ha, a nucleus estate of 1,886.3 ha at Okumaning (with an additional 1,640.5 ha under plans for development as a nucleus estate) and approximately 13, 887.6 ha in out-grower plantations. The processing facilities include a 60 tonne of fresh fruit bunch/hour crude palm oil mill, a soon-to-be-opened 100 tonne/day vegetable oil refinery (expandable to 150 tonnes per day), a 100 tonne/day fractionation plant (to produce Olein and Stearin), and a boiler/turbine cogeneration plant capable of generating 2.5 megawatts of electricity. The physical plant additionally includes staff quarters, offices, workshops, fuel station, health center, wastewater treatment facilities, fuel tanks, and oil storage tanks.The proposed project would complement the company’s investment program, which started in 2003, and allow it to expand and optimize its operations through:- re-planting and planting of oil palm trees on its farms and newly acquired land; - expansion and upgrading of its infrastructure; - meeting additional working capital needs; and - refinancing an existing bank debt. |
Original sector | AB - Palm Oil |
Location
Country | Ghana |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Wind, Education, Government, Power Generation (CCGT), Oil and Gas, Commercial, Raw Materials, Manufacturing (Industrial) |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Ghana
- Establishment of Commercial Poultry Farm
- Ghalia Ghana Company Limited
- Zoompak Teshie Transfer Station and Medical Waste Treatment Facility
- Ghana - Improved Sanitation and Water Supply Service Delivery to the Urban Poor in Ghana through Tripartite Partnerships
- Bridge Power Project Tema
- Fruits and Vegetables Production
- Production of Salt
- Tema Container Terminal
