Gorge Soccer Association - Hampton Park Artificial Turf Replacement Project
Completed · British Columbia
Source: Infrastructure Canada
The project will increase access to community and recreation by replacing two existing artificial turf playing fields at Hampton Park. The project works will include: - General site preparation; - Remove existing artificial turf playing surface; - Regrade existing subsurface materials as necessary; - Install shock/drainage pad; - Install new turf playing surface; - Recycle used turf materials; and
- Status
- Closed
- Sector
- Community, Culture and Recreation
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Gorge Soccer Association - Hampton Park Artificial Turf Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will increase access to community and recreation by replacing two existing artificial turf playing fields at Hampton Park. The project works will include: - General site preparation; - Remove existing artificial turf playing surface; - Regrade existing subsurface materials as necessary; - Install shock/drainage pad; - Install new turf playing surface; - Recycle used turf materials; and, - Site cleanup. |
Original sector | Community, Culture and Recreation |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
