Goshen CRV Well 3 Connection
Sector: Power Transmission • Location: Middletown, New York, United States of America
Source: Dodge USA
The project consists of the following: Coordinate with the Village of Goshen Water Plant Operator or his/her designate. Furnish and install a disconnect and stanchion along with all buried conduit and wire for Well 3. Demolish the existing facility disconnect, 3 phase distribution panel, automatic transfer switch, and all associated wire, conduit, and circuit breakers. Coordinate with the utility
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consists of the following: Coordinate with the Village of Goshen Water Plant Operator or his/her designate. Furnish and install a disconnect and stanchion along with all buried conduit and wire for Well 3. Demolish the existing facility disconnect, 3 phase distribution panel, automatic transfer switch, and all associated wire, conduit, and circuit breakers. Coordinate with the utility company for the removal of the existing transformer and installation of a new transformer. Furnis... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Transmission projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
- LOT-12 MAIN HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
- LOT-7 HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC. UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- LOT-4 MAIN HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC. UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
