logo
ProjectGc Bidding

Goshen CRV Well 3 Connection

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The project consists of the following: Coordinate with the Village of Goshen Water Plant Operator or his/her designate. Furnish and install a disconnect and stanchion along with all buried conduit and wire for Well 3. Demolish the existing facility disconnect, 3 phase distribution panel, automatic transfer switch, and all associated wire, conduit, and circuit breakers. Coordinate with the utility

Status
Under Construction
Sector
Water Supply and Storage, Power Transmission, Consumer Products, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment
Location
Middletown, New York, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Goshen CRV Well 3 Connection

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Goshen CRV Well 3 Connection” is an infrastructure initiative in the Water Supply and Storage sector, located in Middletown, New York, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the following: Coordinate with the Village of Goshen Water Plant Operator or his/her designate. Furnish and install a disconnect and stanchion along with all buried conduit and wire for Well 3. Demolish the existing facility disconnect, 3 phase distribution panel, automatic transfer switch, and all associated wire, conduit, and circuit breakers. Coordinate with the utility company for the removal of the existing transformer and installation of a new transformer. Furnis...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Middletown

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Consumer Products, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2024-07-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project