ProjectClosed

Gosikhurd Project

One of 10,000+ projects Taiyo tracks in Maharashtra.

Source: India Investment Grid (IIG)

Information Department of water resources-MH - II has come up with Gosikhurd Project with a ticket size of 12770.1 INR Crores. This project in Irrigation sub-sector involves [i] 11360 m long Roller filled earthen dam and 773.90 m long broad crested ogee shaped spill way with 33 number radial gates. [ii] Left and Right bank canals with 4 foreshore lifts are provided from the main reser

Status
Closed
Sector
Hydro, Water Supply and Storage, Road, Government, Manufacturing (Industrial)
Location
Pauni, Maharashtra, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Gosikhurd Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Gosikhurd Project” is an infrastructure initiative in the Hydro sector, located in Pauni, Maharashtra, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information Department of water resources-MH - II has come up with Gosikhurd Project with a ticket size of 12770.1 INR Crores. This project in Irrigation sub-sector involves [i] 11360 m long Roller filled earthen dam and 773.90 m long broad crested ogee shaped spill way with 33 number radial gates. [ii] Left and Right bank canals with 4 foreshore lifts are provided from the main reservoir. The Right bank canal 99.51 km. long is designed to carry surplus monsoon waters of the Gosikhurd Reservoir to augment the existing Asolamendha tank command in Chandrapur district and remodeling the entire canal system of Asolamendha Tank to augment irrigation from 9500 ha. to 54,879 ha. In addition to the Gosikhrud irrigable area of 71810 ha. The left bank canal, 23 km. long is designed to irrigate an area of 31577 ha. [iii]Total irrigable command under this project will be 1,90,000 ha. With annual irrigation potential of 2,50,800 ha. The current status of the project is under construction and is being developed through the EPC route. Economic/Social Impact of the Project Gosikhurd Project was declared as National Project in 2008. The project was included under Centrally Sponsored Scheme, PMKSY-AIBP in 2016 for funding and early completion. The Project envisages construction of [i] 11360 m long Roller filled earthen dam and 773.90 m long broad crested ogee shaped spill way with 33 number radial gates. [ii] Left and Right bank canals with 4 foreshore lifts are provided from the main reservoir. The Right bank canal 99.51 km. long is designed to carry surplus monsoon waters of the Gosikhurd Reservoir to augment the existing Asolamendha tank command in Chandrapur district and remodeling the entire canal system of Asolamendha Tank to augment irrigation from 9500 ha. to 54,879 ha. In addition to the Gosikhrud irrigable area of 71810 ha. The left bank canal, 23 km. long is designed to irrigate an area of 31577 ha. [iii]Total irrigable command under this project will be 1,90,000 ha. With annual irrigation potential of 2,50,800 ha. During inclusion of Project under PMKSY-AIBP in 2016 Balance Cost of the Project was Rs 7864.61 crore Eligible Central Assistance was Rs 1043.216 crore CA released since 2016 till July 2023 - 796.105 crore State Share released till July 2023 - Rs 6362.921 crore Physical progress- 71.94 percentage Financial Progress- 90.94 percentage Ultimate Irrigation Potential is 250800 Ha Irrigation Potential created till September 2023 - 177658 Ha Projected Date of Completion- December 2024

Original sector

Water Resources

Procurement method

Budget

Location

Country

India

State

Maharashtra

City

Pauni

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Hydro, Water Supply and Storage, Road, Government, Manufacturing (Industrial)

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project