Goulburn River Solar-Plus-Storage Project
Sector: Solar • Location: Merriwa, New South Wales, Australia
Source: Energy-Storage.News
A 49MW/562MWh battery energy storage system (BESS) co-located at the 585MWdc Goulburn River solar PV power plant in New South Wales, Australia. The project features a 10-hour duration battery system and is one of the first large-scale DC-coupled solar-battery hybrid installations in Australia. It aims to firm solar generation and enable coal plant retirements on or ahead of schedule.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A 49MW/562MWh battery energy storage system (BESS) co-located at the 585MWdc Goulburn River solar PV power plant in New South Wales, Australia. The project features a 10-hour duration battery system and is one of the first large-scale DC-coupled solar-battery hybrid installations in Australia. It aims to firm solar generation and enable coal plant retirements on or ahead of schedule. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
