Government Center Utility Infrastructure and Parking Lot
Sector: Water Supply and Storage • Location: Elkhorn, Wisconsin, United States of America
Source: Dodge
The bid solicited is for underground sanitary sewer, storm sewer, and water service repair / replacement and parking lot layout revisions / expansion per the Plans and Specifications issued by Baxter & Woodman. Work includes sanitary sewer, storm sewer and domestic water line replacement or CIP lining. Asphalt parking lot and cast in place concrete sidewalk/curb and gutter repairs at excavations f
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Mass Transit, Power Transmission, Car parking, Power Generation (CCGT), Road, Automotive, Rail, Waste Processing and Treatment, Commercial
- Location
- Elkhorn, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Government Center Utility Infrastructure and Parking Lot
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The bid solicited is for underground sanitary sewer, storm sewer, and water service repair / replacement and parking lot layout revisions / expansion per the Plans and Specifications issued by Baxter & Woodman. Work includes sanitary sewer, storm sewer and domestic water line replacement or CIP lining. Asphalt parking lot and cast in place concrete sidewalk/curb and gutter repairs at excavations for utility work and parking lot expansion from 98 to 108 parking spaces. Lot seal coat, striping ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Elkhorn |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Mass Transit, Power Transmission, Car parking, Power Generation (CCGT), Road, Automotive, Rail, Waste Processing and Treatment, Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
