Goyder North Battery Project
The owner, status and timeline of this project. A free account opens every field.
Source: Renew Economy
The Goyder North Battery Project consists of two stages, each with 75 MW output capacity and 600 MWh storage capacity, totaling 400 MW and 1,600 MWh over two stages. It is designed to supply 100 MW of base-load renewables to BHP's Olympic Dam operations and meet the requirements of the South Australia firming tender contract.
- Status
- Closed
- Sector
- Hydro, Energy Storage, Government
- Location
- South Australia, Australia
- Updated
- 22 Jul 2026
- Source
- Renew Economy
ConstructChat
Ask ConstructChat about Goyder North Battery Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Goyder North Battery Project consists of two stages, each with 75 MW output capacity and 600 MWh storage capacity, totaling 400 MW and 1,600 MWh over two stages. It is designed to supply 100 MW of base-load renewables to BHP's Olympic Dam operations and meet the requirements of the South Australia firming tender contract. |
Original sector | Energy |
Location
Country | Australia |
State | South Australia |
Source
Source | Renew Economy |
URL |
More Details
Record type | Project |
Sector | Hydro, Energy Storage, Government |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
