logo

GPS Nakhon Sawan & Chai Nat Solar Plants

Sector: Power Generation (CCGT) • Location: Thailand

Source: World Bank Group

Project
Active

G-Power Source Company, a subsidiary of Gunkul Engineering from Thailand, was developing four solar plants of 6.5MW each. The first 3 projects, Ta Khit and Ta Sang in Nakhon Sawan, and Dong Khon in Chai Nat, consisted of 19.5MW. Since 2012, 60% was owned by EGCO, from Thailand.EGCO purchased the equity via 4.5 million shares at a total amount of Baht 630 million (US$20.4 million). Total payments w

Status
Prospective
Sector
Power Generation (CCGT), Solar, Commercial, Government
Location
Thailand
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about GPS Nakhon Sawan & Chai Nat Solar Plants

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “GPS Nakhon Sawan & Chai Nat Solar Plants” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

G-Power Source Company, a subsidiary of Gunkul Engineering from Thailand, was developing four solar plants of 6.5MW each. The first 3 projects, Ta Khit and Ta Sang in Nakhon Sawan, and Dong Khon in Chai Nat, consisted of 19.5MW. Since 2012, 60% was owned by EGCO, from Thailand.EGCO purchased the equity via 4.5 million shares at a total amount of Baht 630 million (US$20.4 million). Total payments were Baht 738 million (US$24 million), which included a payment towards the development of the fourth plant (6.5MW). G-Power held 4 PPA agreements with the state-owned Provincial Electricity Authority (PEA), 6.5MW each. On top of the standard tariff, the projects were to receive Baht 8/kWh (US$260/MWh) in adder payments, from the Power Department Fund Management Division, of the Energy Regulatory Commission. The plants were commissioned on the following dates: 1 Mar 2012, 2 March 2012, 5 March 2012, 1 February 2013. Total cost were unknown, but estimated at US$2.8 million/MW (US$54.6 million). Financial closure date was ESTIMATED at March 2012, commissioning date of plants 1-3. http://www.bloomberg.com/news/2012-08-22/gunkul-plans-to-double-revenue-on-renewable-energy-power-plants.html Power in Asia, Thailands EGCO buys more solar plant, 12 April 2012

Original sector

Energy

Budget

Location

Country

Thailand

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Commercial, Government

Article published date

2024-06-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project