logo

GPSD Automation Updates Phase 1

Sector: Water Supply and Storage • Location: Peoria, Illinois, United States of America

Source: Dodge

Project
Closed

The project consists of the upgrade of five treatment plant PLC control panels, installation of associated radio network hardware, and replacement of four RAW/WAS variable frequency drives (VFDs).

Status
Closed
Sector
Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
Location
Peoria, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about GPSD Automation Updates Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “GPSD Automation Updates Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Peoria, Illinois, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the upgrade of five treatment plant PLC control panels, installation of associated radio network hardware, and replacement of four RAW/WAS variable frequency drives (VFDs).

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Peoria

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment, Commercial

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project