Grace Episcopal Chapel Project
Sector: Consumer Products • Location: Port Orange, Florida, United States of America
Source: Dodge
The repair/replacement of the Chapel bell tower, roof, along with several other external repairs/replacements. 1.Repair/replace Bell Tower woodwork, including decking, railing and siding; 2.Repair ten (10) stained glass windows; 3.Repair/replace exterior concrete steps and brick pier; 4.Paint exterior wood siding
- Status
- Closed
- Sector
- Consumer Products, Cement, Commercial, Seaport, Rail, Manufacturing (Industrial)
- Location
- Port Orange, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Grace Episcopal Chapel Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The repair/replacement of the Chapel bell tower, roof, along with several other external repairs/replacements. 1.Repair/replace Bell Tower woodwork, including decking, railing and siding; 2.Repair ten (10) stained glass windows; 3.Repair/replace exterior concrete steps and brick pier; 4.Paint exterior wood siding |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Port Orange |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Cement, Commercial, Seaport, Rail, Manufacturing (Industrial) |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
