Grade Road Self Storage REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
New construction of a 4-level storage facility with a manager s office. Scope of work includes but is not limited to: Job Trailer, Temp Fencing, Temp Toilet, Final Cleaning, Construction Staking, Sitework & Utilities, Directional Boring, Dewatering, Traffic Control, Shoring, Concrete Detention Vault, Asphalt Pavement, Stripe/Sign/Wheel Stop, Extruded Curb, Fencing, Landscape, Site Concrete, Buildi
- Status
- Closed
- Sector
- Consumer Products, Steel, Cement, Power Transmission, Raw Materials, Manufacturing (Industrial), Warehouse, Road, Commercial, Power Generation (CCGT), Residential, Metal
- Location
- Lake Stevens, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Grade Road Self Storage REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New construction of a 4-level storage facility with a manager s office. Scope of work includes but is not limited to: Job Trailer, Temp Fencing, Temp Toilet, Final Cleaning, Construction Staking, Sitework & Utilities, Directional Boring, Dewatering, Traffic Control, Shoring, Concrete Detention Vault, Asphalt Pavement, Stripe/Sign/Wheel Stop, Extruded Curb, Fencing, Landscape, Site Concrete, Building Foundation/SOG, Sealed Concrete, Masonry, Steel Fabrication, Waterproofing, Insulation: Simple... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Lake Stevens |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Steel, Cement, Power Transmission, Raw Materials, Manufacturing (Industrial), Warehouse, Road, Commercial, Power Generation (CCGT), Residential, Metal |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
