Grade Separation Durant Road
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Borrow excavation, aggregate material, temporary shoring, guardrail, fencing, signing, permanent pavement markings, removeable tape, utilities water, sewer, line stops, wet taps, erosion control, concrete girder bridge and components, signals/ITS System, concrete flatwork, asphalt paving and milling, MSE Walls, clearing and grubbing, roadway lighting, guardrail, MOT material, surveying, and storm
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Bridge, Cement, Power Transmission, Road, Waste Processing and Treatment, Mass Transit, Government, Rail, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Raleigh, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Grade Separation Durant Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Borrow excavation, aggregate material, temporary shoring, guardrail, fencing, signing, permanent pavement markings, removeable tape, utilities water, sewer, line stops, wet taps, erosion control, concrete girder bridge and components, signals/ITS System, concrete flatwork, asphalt paving and milling, MSE Walls, clearing and grubbing, roadway lighting, guardrail, MOT material, surveying, and storm drain |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Raleigh |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Bridge, Cement, Power Transmission, Road, Waste Processing and Treatment, Mass Transit, Government, Rail, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
