Grading, Drainage, Hot Mix Paving, Structure and Electrical
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Grading, Drainage, Hot Mix Paving, Structure and Electrical, HWY 40 From 1.3 km south of Lambton Road 25 (Confederation Line) to 0.8 km north of Lambton Road 25 (Confederation Line)
- Status
- Closed
- Sector
- Raw Materials, Power Generation (CCGT), Road, Seaport, Waste Processing and Treatment, Power Transmission, Commercial, Water Supply and Storage
- Location
- Port Lambton, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Grading, Drainage, Hot Mix Paving, Structure and Electrical
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Grading, Drainage, Hot Mix Paving, Structure and Electrical, HWY 40 From 1.3 km south of Lambton Road 25 (Confederation Line) to 0.8 km north of Lambton Road 25 (Confederation Line) |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Port Lambton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Power Generation (CCGT), Road, Seaport, Waste Processing and Treatment, Power Transmission, Commercial, Water Supply and Storage |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
