logo

Graham Group Warehouse Building 3

Sector: Cement • Location: Altoona, Iowa, United States of America

Source: Dodge USA

Project
Delayed

Proposed construction of a new 405,000 SF Warehouse. The framing will consist of reinforced steel buildings with precast concrete walls

Status
Failure
Sector
Cement, Steel, Manufacturing (Industrial), Warehouse, Commercial, Metal
Location
Altoona, Iowa, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Graham Group Warehouse Building 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Graham Group Warehouse Building 3” is an infrastructure initiative in the Cement sector, located in Altoona, Iowa, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Proposed construction of a new 405,000 SF Warehouse. The framing will consist of reinforced steel buildings with precast concrete walls

Procurement method

Budget

Location

Country

United States of America (USA)

State

Iowa

City

Altoona

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Steel, Manufacturing (Industrial), Warehouse, Commercial, Metal

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project