logo
ProjectCancelled

Grain Belt Express Phase 1 Transmission Project

Sector: Power Transmission • Location: Kansas, Missouri, Illinois, and one other state, United States

Source: Electrek

The Grain Belt Express Phase 1 is an 800-mile high-voltage direct current (HVDC) transmission line connecting Kansas wind farms across four states. It aims to connect four grids, improve reliability, power 50 data centers, and create 5,500 jobs. The project is planned to start next year and will be built in phases from Kansas to Illinois, with a capacity of 5 GW. It is expected to save customers $

Status
Closed
Sector
Power Transmission, Power Generation (CCGT), Wind, Government
Location
Kansas, Missouri, Illinois, and one other state, United States of America
Updated
22 Jul 2026
Source
Electrek

ConstructChat

Ask ConstructChat about Grain Belt Express Phase 1 Transmission Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Grain Belt Express Phase 1 Transmission Project” is an infrastructure initiative in the Power Transmission sector, located in Kansas, Missouri, Illinois, and one other state, United States. Taiyo aggregates data on it from Electrek.

Participants

Sponsoring Agency

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Grain Belt Express Phase 1 is an 800-mile high-voltage direct current (HVDC) transmission line connecting Kansas wind farms across four states. It aims to connect four grids, improve reliability, power 50 data centers, and create 5,500 jobs. The project is planned to start next year and will be built in phases from Kansas to Illinois, with a capacity of 5 GW. It is expected to save customers $52 billion in energy costs over 15 years.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Kansas, Missouri, Illinois, and one other state

Source

Source

Electrek

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Wind, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project