GRAIN STORAGE
One of 10,000+ projects Taiyo tracks in Argentina.
Source: World Bank Group
The project would help increase exports of grain and obtain better export prices by constructing up-country grain storage and conditioning facilities and by improving transport facilities. The project consists of constructing 20 silos with an average capacity of 100,000 m tons, each equipped with drying, cleaning and fumigating facilities; minor improvements of rail reception facilities at major p
- Status
- Closed
- Sector
- Rail, Automotive, Seaport, Raw Materials, Government
- Location
- Argentina
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about GRAIN STORAGE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would help increase exports of grain and obtain better export prices by constructing up-country grain storage and conditioning facilities and by improving transport facilities. The project consists of constructing 20 silos with an average capacity of 100,000 m tons, each equipped with drying, cleaning and fumigating facilities; minor improvements of rail reception facilities at major ports; and modification of 2,000 box cars for effective grain transport. Through technical assistance, the project will improve the Grain Board's computerized inventory control system and its capabilities for inspection and supervision of primary silos. Also included are a program for training Grain Board staff to operate project silos and pilot dredging for the Port of Bahia Blanca to determine the feasibility of deepening the port access channel. There are no special risks, although inefficient silo management and lower grain production levels than forecast could cause lower volumes of grain to pass through the silos and consequently result in smaller than projected benefits. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Argentina |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Rail, Automotive, Seaport, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Rail projects in Argentina
- Construction and laying of temporary and definite railway lines including signaling and complementary works of 2 new stations (Buenos Aires elevated station and head station in Constitución) in Argentina
- Belgrano Freight Railway
- Retiro Railway Terminal
- Transportes Metropolitanos San Martin (TMS)
- Tren a las Nubes
- Transportes Metropolitanos Belgrano (TMB)
- Cerro Vanguardia S.A.
- Excologistica S.A.
