Grain to Tilbury Cable Tunnel Project
Sector: Power Generation (CCGT) • Location: United Kingdom
Source: The Tunnelling Journal
The Grain to Tilbury project involves the construction of a 2.2km cable tunnel, including two deep shafts and associated infrastructure, as part of the National Grid's electricity network upgrade. The project will utilize advanced engineering techniques and a Vertical Shaft Sinking Machine to enhance safety and efficiency.
- Status
- Closed
- Sector
- Power Generation (CCGT), Tunnel
- Location
- United Kingdom
- Updated
- 22 Jul 2026
- Source
- The Tunnelling Journal
ConstructChat
Ask ConstructChat about Grain to Tilbury Cable Tunnel Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Grain to Tilbury project involves the construction of a 2.2km cable tunnel, including two deep shafts and associated infrastructure, as part of the National Grid's electricity network upgrade. The project will utilize advanced engineering techniques and a Vertical Shaft Sinking Machine to enhance safety and efficiency. |
Original sector | Electricity |
Procurement method | |
Budget |
Location
Country | United Kingdom (UK) |
Source
Source | The Tunnelling Journal |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Tunnel |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
