Grainger County WWTP Improvements
Sector: Raw Materials • Location: Rutledge, Tennessee, United States of America
Source: Dodge
The work generally includes: Influent Pump Station Improvements, Installation of Bar Screen, Refurbishment of Existing Overflow Weir Plate, Installation of Influent and Effluent Flow Monitoring Equipment, Replacement of the EQ Pumps and Panel, Cleaning and Lining of the Existing Influent Wet Well, and Installation of 6 Force Main Piping and Fittings.
- Status
- Closed
- Sector
- Raw Materials, Waste Processing and Treatment, Fertilizers, Government, Commercial
- Location
- Rutledge, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Grainger County WWTP Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work generally includes: Influent Pump Station Improvements, Installation of Bar Screen, Refurbishment of Existing Overflow Weir Plate, Installation of Influent and Effluent Flow Monitoring Equipment, Replacement of the EQ Pumps and Panel, Cleaning and Lining of the Existing Influent Wet Well, and Installation of 6 Force Main Piping and Fittings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Rutledge |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Waste Processing and Treatment, Fertilizers, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
