Grand Avenue Pipeline Replacement
Sector: Cement • Location: CA, United States of America (USA)
Source: Anvil Builders
The East Bay Municipal Utility District (East Bay MUD) operates and maintains over 4,200 miles of waterlines, providing service to more than 1.4 million customers. The overall system is aging, making these waterlines more susceptible to cracking, corroding and even bursting. Over the next five years, East Bay MUD intends to replace more than 50 miles of these aging waterlines. Anvil Builders was c
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The East Bay Municipal Utility District (East Bay MUD) operates and maintains over 4,200 miles of waterlines, providing service to more than 1.4 million customers. The overall system is aging, making these waterlines more susceptible to cracking, corroding and even bursting. Over the next five years, East Bay MUD intends to replace more than 50 miles of these aging waterlines. Anvil Builders was contracted to replace waterlines running under Grand Avenue in Oakland—an 88-year-old facility consisting of both low- and high-pressure pipelines. Installation included 1,900 feet of 20” and 24” mortar-lined and plastic-coated steel pipe, and 2,300 feet of 6” and 8” HDPE pipe. Asphalt and concrete demolition was required to start the project, followed by restoration of Grand Avenue upon completion of the pipeline installation. Maintaining a safe work zone during this project was imperative due to heavy vehicular traffic on Grand Avenue and the large number of pedestrians commuting to and from nearby schools. The work was significantly impacted due to restrictions on the permitted hours of operation (6-hour days) and because of unexpected groundwater levels causing trench walls to collapse on a daily basis. Conflicts with existing utilities, scheduled shutdowns and long-lead time items were complications that had to be overcome during the course of construction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
