Grand Bara solar power plant
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project involves the development of a 25 MW power plant utilizing photovoltaic technology and a 5MWh battery energy storage system in the Grand Bara region of Djibouti. This initiative, developed under a Build-Own-Operate and Transfer (BOOT) model. The sponsor of the project AMEA Power has signed a 25-year power purchase agreement with Électricité de Djibouti (EDD). The Sovereign Fund of Djibo
- Status
- Prospective
- Sector
- Solar, Wind, Waste Processing and Treatment, Energy Storage, Power Generation (CCGT), Government
- Location
- Djibouti
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Grand Bara solar power plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a 25 MW power plant utilizing photovoltaic technology and a 5MWh battery energy storage system in the Grand Bara region of Djibouti. This initiative, developed under a Build-Own-Operate and Transfer (BOOT) model. The sponsor of the project AMEA Power has signed a 25-year power purchase agreement with Électricité de Djibouti (EDD). The Sovereign Fund of Djibouti will join the project as a minority shareholder before financial close. The country has set a goal to reduce its carbon dioxide (CO2) emissions by 40% by the year 2030. The solar power project contributes to this objective by providing a renewable energy source that produces electricity with lower environmental impact compared to conventional fossil fuels. The project aims to have a positive impact on the local population by providing electricity to approximately 66,500 people. In December 2023, AMEA Power signed a memorandum of understanding (MoU) which will see the capacity of the plant increase to 50MW of PV plus 10MWh of BESS. The agreement was signed on the COP28 climate conference in Dubai. The PPA for the first phase was signed on August 28, 2023 and the construction start was confirmed by the Minister of Energy in October 2023. https://www.ameapower.com/amea-power-expands-its-presence-in-east-africa-by-signing-a-power-purchase-agreement-with-electricite-de-djibouti-for-a-25mw-solar-pv-plant-with-battery-storage/ https://www.adi.dj/index.php/site/Plus/11071 https://www.constructafrica.com/news/amea-power-signs-solar-wind-and-desalination-deals |
Original sector | Energy |
Location
Country | Djibouti |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Wind, Waste Processing and Treatment, Energy Storage, Power Generation (CCGT), Government |
Article published date | 2025-12-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Djibouti
- Adailou Village Off-Grid Solar Power Station
- Grand Bara Solar Plant
- Omar Kaji Solar Power Plant
- DJ (GEF) Geothermal Power Generation Program
- Doubling the capacity of the desalination plant, construction of a solar energy plant
- Grand Bara Solar-Plus-Storage Project
- Djibouti Power Access and Diversification Project
- Adailou's First Off-Grid Solar Project
