Grand Coulee Dam Airport - Install AVGAS Fuel Tank
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Work generally consists of installing a 12,000-gallon above ground, self-serve, Aviation Gasoline (AVGAS) fueling system, demolition of a portion of the existing asphalt apron, installation of a new concrete fueling apron, and other site improvements.
- Status
- Prospective
- Sector
- Aerospace & Defense, Water Supply and Storage, Hydro, Consumer Products, Government, Airport, Cement, Raw Materials, Road, Commercial, Power Generation (CCGT)
- Location
- Electric City, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Grand Coulee Dam Airport - Install AVGAS Fuel Tank
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work generally consists of installing a 12,000-gallon above ground, self-serve, Aviation Gasoline (AVGAS) fueling system, demolition of a portion of the existing asphalt apron, installation of a new concrete fueling apron, and other site improvements. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Electric City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Water Supply and Storage, Hydro, Consumer Products, Government, Airport, Cement, Raw Materials, Road, Commercial, Power Generation (CCGT) |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Aerospace & Defense projects in United States of America
- DCA Terminal A Improvements
- ATL Plane Train Tunnel West Extension
- Kansas City International Airport (MCI) New Single Terminal
- MTPD District II Substation & Training Facility
- IAD East/West Baggage Handling & Concourse C/D Rehabilitation
- LAX Central Utility Plant Replacement
- Ellington Airport (EFD) Traffic Control Tower and Utility Building
- LAX Tom Bradley International Terminal Improvements
