Grand Drive Bridge Reconstruction
Sector: Water Supply and Storage • Location: St. Louis, Missouri, United States of America
Source: Dodge
Providing professional engineering services for a bridge replacement project. Boundary and topographic surveys. Geotechnical investigation. Grading design. Bridge demolition plan. Bridge structure and retaining wall design. Storm sewer and drainage structures design. Roadway, sidewalk and bicycle facilities design. Traffic engineering. Street lighting design. Landscaping. Utilities coordination. P
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Road, Commercial, Car parking, Bridge, Waste Processing and Treatment, Government, Power Generation (CCGT), Automotive
- Location
- St. Louis, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Grand Drive Bridge Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Providing professional engineering services for a bridge replacement project. Boundary and topographic surveys. Geotechnical investigation. Grading design. Bridge demolition plan. Bridge structure and retaining wall design. Storm sewer and drainage structures design. Roadway, sidewalk and bicycle facilities design. Traffic engineering. Street lighting design. Landscaping. Utilities coordination. Providing professional engineering services for the replacement of the adjacent Grand Drive Bridge... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | St. Louis |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Road, Commercial, Car parking, Bridge, Waste Processing and Treatment, Government, Power Generation (CCGT), Automotive |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
