Grand Ethiopian Renaissance Dam (GERD)
Sector: Water Supply and Storage • Location: Addis Abeba, Ethiopia
Source: Addis Standard
The Grand Ethiopian Renaissance Dam (GERD) is the largest hydropower project ever built in Africa, designed and constructed by Webuild. It has an installed capacity of more than 5,000 MW and an annual output projection of 15,700 GWh, equivalent to the energy of three medium-sized nuclear power plants. The dam reservoir stretches 172 kilometers and can hold up to 74 billion cubic meters of water. T
- Status
- Closed
- Sector
- Water Supply and Storage, Nuclear, Power Generation (CCGT), Hydro, Cement, Government
- Location
- Addis Abeba, Ethiopia
- Updated
- 22 Jul 2026
- Source
- Addis Standard
ConstructChat
Ask ConstructChat about Grand Ethiopian Renaissance Dam (GERD)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Grand Ethiopian Renaissance Dam (GERD) is the largest hydropower project ever built in Africa, designed and constructed by Webuild. It has an installed capacity of more than 5,000 MW and an annual output projection of 15,700 GWh, equivalent to the energy of three medium-sized nuclear power plants. The dam reservoir stretches 172 kilometers and can hold up to 74 billion cubic meters of water. The main dam rises 170 meters, spans 1,800 meters at the crest, and required 10.7 million cubic meters of concrete, making it Africa's largest roller-compacted concrete gravity dam. The project has transformed its surroundings with new social infrastructure and employed over 25,000 workers during construction. |
Original sector | Energy |
Location
Country | Ethiopia |
City | Addis Abeba |
Source
Source | Addis Standard |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Nuclear, Power Generation (CCGT), Hydro, Cement, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Ethiopia
- Establishing a Joint Venture/Development of a new project/Extraction of salt/Ashalie Salt Suppliers
- Expansion project for bottled water
- A new project on manufacturing of Purified Bottled water.
- Establishment of an Iodized salt production unit.
- Manufacturing of Metallic Container
- Production of Wine and Champagne
- SBG INDUSTRY PLC Food Complex
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of soft drinks; production of mineral waters/HALAL ETHIOPIA CAPACITY IMPROVEMENT PROGRAM
