Grand Rapids South Secondary MCC Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Electrical Motor Control Center at the Treatment Plant located in the South Secondary Control Building. These are critical devices necessary for the safe operation of motors needed in the Secondary treatment process. Due to their age (50 years), parts are no longer available, so the entire device must be replaced. Replacement of MCC's X and Z in South Secondary Building. Replacement of Panel G.
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Government
- Location
- Grand Rapids, Michigan, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Grand Rapids South Secondary MCC Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Electrical Motor Control Center at the Treatment Plant located in the South Secondary Control Building. These are critical devices necessary for the safe operation of motors needed in the Secondary treatment process. Due to their age (50 years), parts are no longer available, so the entire device must be replaced. Replacement of MCC's X and Z in South Secondary Building. Replacement of Panel G. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Grand Rapids |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
