Grandstand
Closed · Michigan · Last reported Feb 2025
Source: Dodge
Requirements Improvements to existing Grandstands to allow for safety in railings and minimize the gaps in the flooring. Update to code in all areas including railings, handicap ramp, seating and floor boards. Update flooring, toe kicks and rear toe kick boards Install railing system
- Status
- Closed
- Sector
- Commercial, Stadium, Rail, Road, Government, Manufacturing (Industrial)
- Location
- Rudyard, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Grandstand
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Requirements Improvements to existing Grandstands to allow for safety in railings and minimize the gaps in the flooring. Update to code in all areas including railings, handicap ramp, seating and floor boards. Update flooring, toe kicks and rear toe kick boards Install railing system |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Rudyard |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Stadium, Rail, Road, Government, Manufacturing (Industrial) |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
