Grant Co Ridge Road Construction Phase I
Sector: Water Supply and Storage • Location: Silver City, New Mexico, United States of America
Source: Dodge
The termini of the project are along Ridge Road from the intersection of Ridge Road and Lance Drive and south to just before the intersection of S Bonita Ave and Ridge Rd. The overall project length is approximately 0.766 miles. Work includes the removal of existing surfacing of approximately 10,374 square yards, the removal and replacement of 5 drainage culverts and the construction of 2 new drai
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment
- Location
- Silver City, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Grant Co Ridge Road Construction Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The termini of the project are along Ridge Road from the intersection of Ridge Road and Lance Drive and south to just before the intersection of S Bonita Ave and Ridge Rd. The overall project length is approximately 0.766 miles. Work includes the removal of existing surfacing of approximately 10,374 square yards, the removal and replacement of 5 drainage culverts and the construction of 2 new drainage culverts, all with Class C riprap over soil retention blankets. Replacing the roadway consis... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Silver City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
