Grassland School Modernization
Sector: Commercial • Location: Athabasca, Alberta, Canada
Source: Dodge USA
A partial modernization to address deficiencies identified in the ReCapp Audit 2012. The school was built in 1957; the facility audit indicates that there are several items that require repair. There are roof structures that require replacement as well as interior and exterior finishes such as flooring and soffits/fascia, mechanical, electrical service upgrade windows and doors. The school require
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Power Transmission, Education, Government
- Location
- Athabasca, Alberta, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Grassland School Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | A partial modernization to address deficiencies identified in the ReCapp Audit 2012. The school was built in 1957; the facility audit indicates that there are several items that require repair. There are roof structures that require replacement as well as interior and exterior finishes such as flooring and soffits/fascia, mechanical, electrical service upgrade windows and doors. The school requires rightsizing; the ACU report indicates that it is 25% utilized. Rightsizing would reduce operati... |
Budget |
Location
Country | Canada |
State | Alberta |
City | Athabasca |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Power Transmission, Education, Government |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
