logo

Gray Summit Data Center Development

Sector: Data Center • Location: Gray Summit, Missouri, United States

Source: Wajah Batam News

Project
Planned

A large-scale data center is planned to be developed on a 644-acre farm near Interstate 44 at Gray Summit, Missouri. The farm was sold by LB Eckelkamp Jr., CEO and board chairman of the Bank of Washington, to Provident Data Centers. The project has faced significant local opposition due to concerns about environmental impact, noise, and size regulations. The developer has proposed a closed-loop co

Project Information FAQ

Project Information

3 Q
The project “Gray Summit Data Center Development” is an infrastructure initiative in the Data Center sector, located in Gray Summit, Missouri, United States. Taiyo aggregates data on it from Wajah Batam News.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A large-scale data center is planned to be developed on a 644-acre farm near Interstate 44 at Gray Summit, Missouri. The farm was sold by LB Eckelkamp Jr., CEO and board chairman of the Bank of Washington, to Provident Data Centers. The project has faced significant local opposition due to concerns about environmental impact, noise, and size regulations. The developer has proposed a closed-loop cooling system to minimize water usage and committed to maintaining noise levels at ambient levels. The data center is expected to generate over $50 million annually in new tax revenue for Franklin County.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data