Graytown Parking Lot Nature-Based Solutions
Sector: Water Supply and Storage • Location: Elmendorf, Texas, United States of America
Source: Dodge
Construction for +/-10,000 SF parking lot serving the existing pavilion at Graytown Park in City of San Antonio ETJ, Bexar County, TX. Project includes +/-2,500 SF Permeable Interlocking Concrete Pavers with impermeable liner and underdrain and +/-7,500 SF Type D HMAC ; construction for concrete sidewalk & 1" water service relocation. Mass excavation to be completed by the River Authority prior to
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Car parking, Government, Cement, Automotive
- Location
- Elmendorf, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Graytown Parking Lot Nature-Based Solutions
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction for +/-10,000 SF parking lot serving the existing pavilion at Graytown Park in City of San Antonio ETJ, Bexar County, TX. Project includes +/-2,500 SF Permeable Interlocking Concrete Pavers with impermeable liner and underdrain and +/-7,500 SF Type D HMAC ; construction for concrete sidewalk & 1" water service relocation. Mass excavation to be completed by the River Authority prior to the work of this Contract. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Elmendorf |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Car parking, Government, Cement, Automotive |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
