GrCF2: Skopje Bus Rapid Transit Project
Signed · North Macedonia
Source: European Bank for Reconstruction and Development (EBRD)
Provision of a sovereign loan of up to EUR 70 million ("the loan") to the Republic of North Macedonia for on-granting to the city of Skopje. The loan will finance the construction of a Bus Rapid Transit ("BRT") corridor on two dedicated lanes, the acquisition of a new tram-bus fleet and the construction of a new depot (the "project") in Skopje. The project will be implemented in two phases and com
- Status
- Under Construction
- Sector
- Road, Government, Mass Transit, Cable car, Residential, Commercial, Automotive
- Location
- Macedonia
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about GrCF2: Skopje Bus Rapid Transit Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provision of a sovereign loan of up to EUR 70 million ("the loan") to the Republic of North Macedonia for on-granting to the city of Skopje. The loan will finance the construction of a Bus Rapid Transit ("BRT") corridor on two dedicated lanes, the acquisition of a new tram-bus fleet and the construction of a new depot (the "project") in Skopje. The project will be implemented in two phases and comprises of two tranches: Tranche 1 of up to EUR 40 million to finance BRT Line 1 (east-west) to be committed at signing, and Tranche 2 of up to EUR 30 million to finance BRT Line 2 (north-south) to be committed upon completion of separate due diligence. The loan will be extended to the Republic of North Macedonia and on-granted to the city of Skopje, which will be the implementing agency. The project is envisaged as part of the EBRD Green Cities Framework 2 ("GrCF2"). The facility is designed to serve as a sector-wide catalyst for addressing environmental challenges at municipal level. |
Original sector | Municipal Infrastructure |
Budget |
Location
Country | Macedonia |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Government, Mass Transit, Cable car, Residential, Commercial, Automotive |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in North Macedonia
- FYROM - ROADS II
- CORRIDOR X ROAD PROJECT
- FYROM ROADS
- Smokovac - Kolasin - Matesevo Section (Phase I), Bar - Boljare Motorway
- Kicevo-Ohrid Highway
- Mapping of cultural heritage in the municipalities of Strumyani and Karbincii and stimulation of the development cultural tourism through integrated tourist products
- ABOVE
- Development of Border Infrastructure between Greece and the former Yugoslav Republic of Macedonia
