GrCF2 W2 - Brcko Water
Sector: Water Supply and Storage • Location: Bosnia and Herzegovina
Source: European Bank for Reconstruction and Development (EBRD)
Provision of EUR 13.0 million debt financing to permanently resolve inadequate pressure in the Brcko District water system and restore water quality in the main centralised water network. This involves the construction of an approximately 14 km long pipeline, a new pumping station and clean water storage reservoir at "Potocari" and targeted reconstruction of between 2-3km of the existing water sup
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | repaying |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Provision of EUR 13.0 million debt financing to permanently resolve inadequate pressure in the Brcko District water system and restore water quality in the main centralised water network. This involves the construction of an approximately 14 km long pipeline, a new pumping station and clean water storage reservoir at "Potocari" and targeted reconstruction of between 2-3km of the existing water supply network to reduce water losses (from 53.1 to around 41.6 per cent) whilst improving system integrity ("the Project"). The Bank's existing sovereign loan of EUR 6.5 million was signed in April 2022. A loan increase of EUR 6.5 million is needed to meet the higher financial offers received through the procurement process as a result of a: i) change of technical specifications from the preliminary design (which was included in the Project's 2018 feasibility study) to the detailed design stage (finalised after project signing). ii) cost increases reflecting inflation in BiH, up from 2% in 2021 to 14.4% in 2022). The Project is a trigger project under EBRD's Green City Framework 2 ("GrCF2") and will include technical cooperation ("TC") facilitated by the Bank for the development of a Green City Action Plan ("GCAP") to identify, prioritise, and address environmental challenges through a multi-sector approach. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
