logo
ProjectRepaying

GrCF2 W2 - Brcko Water

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

Provision of EUR 13.0 million debt financing to permanently resolve inadequate pressure in the Brcko District water system and restore water quality in the main centralised water network. This involves the construction of an approximately 14 km long pipeline, a new pumping station and clean water storage reservoir at "Potocari" and targeted reconstruction of between 2-3km of the existing water sup

Status
Under Construction
Sector
Water Supply and Storage, Government, Commercial, Road, Residential
Location
Bosnia and Herzegovina
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about GrCF2 W2 - Brcko Water

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “GrCF2 W2 - Brcko Water” is an infrastructure initiative in the Water Supply and Storage sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

repaying

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Provision of EUR 13.0 million debt financing to permanently resolve inadequate pressure in the Brcko District water system and restore water quality in the main centralised water network. This involves the construction of an approximately 14 km long pipeline, a new pumping station and clean water storage reservoir at "Potocari" and targeted reconstruction of between 2-3km of the existing water supply network to reduce water losses (from 53.1 to around 41.6 per cent) whilst improving system integrity ("the Project"). The Bank's existing sovereign loan of EUR 6.5 million was signed in April 2022. A loan increase of EUR 6.5 million is needed to meet the higher financial offers received through the procurement process as a result of a: i)       change of technical specifications from the preliminary design (which was included in the Project's 2018 feasibility study) to the detailed design stage (finalised after project signing). ii)      cost increases reflecting inflation in BiH, up from 2% in 2021 to 14.4% in 2022). The Project is a trigger project under EBRD's Green City Framework 2 ("GrCF2") and will include technical cooperation ("TC") facilitated by the Bank for the development of a Green City Action Plan ("GCAP") to identify, prioritise, and address environmental challenges through a multi-sector approach.

Original sector

Municipal Infrastructure

Budget

Location

Country

Bosnia and Herzegovina

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Road, Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project