GrCF2 W2 - Brcko Water

Sector: Road • Location: Bosnia and Herzegovina

Source: European Bank for Reconstruction and Development (EBRD)

Project
Repaying

Provision of EUR 13.0 million debt financing to permanently resolve inadequate pressure in the Brcko District water system and restore water quality in the main centralised water network. This involves the construction of an approximately 14 km long pipeline, a new pumping station and clean water storage reservoir at "Potocari" and targeted reconstruction of between 2-3km of the existing water sup

Project Information FAQ

Project Information

5 Q
The project “GrCF2 W2 - Brcko Water” is an infrastructure initiative in the Road sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaying

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Provision of EUR 13.0 million debt financing to permanently resolve inadequate pressure in the Brcko District water system and restore water quality in the main centralised water network. This involves the construction of an approximately 14 km long pipeline, a new pumping station and clean water storage reservoir at "Potocari" and targeted reconstruction of between 2-3km of the existing water supply network to reduce water losses (from 53.1 to around 41.6 per cent) whilst improving system integrity ("the Project"). The Bank's existing sovereign loan of EUR 6.5 million was signed in April 2022. A loan increase of EUR 6.5 million is needed to meet the higher financial offers received through the procurement process as a result of a: i)       change of technical specifications from the preliminary design (which was included in the Project's 2018 feasibility study) to the detailed design stage (finalised after project signing). ii)      cost increases reflecting inflation in BiH, up from 2% in 2021 to 14.4% in 2022). The Project is a trigger project under EBRD's Green City Framework 2 ("GrCF2") and will include technical cooperation ("TC") facilitated by the Bank for the development of a Green City Action Plan ("GCAP") to identify, prioritise, and address environmental challenges through a multi-sector approach.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data