GrCF2 W2 - CML2: Sustainable Urban Transport Loan
One of 5,002 projects Taiyo tracks in Egypt.
Source: European Bank for Reconstruction and Development (EBRD)
EBRD is considering to provide a Sovereign loan of up to EUR 250 million to the Arab Republic of Egypt to finance the rehabilitation and upgrade of Cairo Metro Line II ("CML2") and related communication equipment in the existing rolling stock fleet (the "Project").
- Status
- Under Construction
- Sector
- Government, Mass Transit, Rail, Power Generation (CCGT), Residential, Commercial
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about GrCF2 W2 - CML2: Sustainable Urban Transport Loan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | disbursing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | EBRD is considering to provide a Sovereign loan of up to EUR 250 million to the Arab Republic of Egypt to finance the rehabilitation and upgrade of Cairo Metro Line II ("CML2") and related communication equipment in the existing rolling stock fleet (the "Project"). |
Original sector | Municipal Infrastructure |
Procurement method | |
Budget |
Location
Country | Egypt |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Government, Mass Transit, Rail, Power Generation (CCGT), Residential, Commercial |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
