GrCF2 W2 E2 Pristina Solar District Heating
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
The Project consist of the construction of a solar thermal plant with a 30 MW capacity to provide additional heat energy capacity and extension of the district heating ("DH") network of the city of Pristina (the "Project"). The Project's scope includes a network extension which will be implemented in stages, with the first stage of up to 50 MW, of which 30 MW will be supplied from the solar therma
- Status
- Under Construction
- Sector
- Geothermal, Power Generation (CCGT), Solar, Government, Commercial, Residential
- Location
- Kosovo
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about GrCF2 W2 E2 Pristina Solar District Heating
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | repaying |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consist of the construction of a solar thermal plant with a 30 MW capacity to provide additional heat energy capacity and extension of the district heating ("DH") network of the city of Pristina (the "Project"). The Project's scope includes a network extension which will be implemented in stages, with the first stage of up to 50 MW, of which 30 MW will be supplied from the solar thermal plant financed by the Project. The remaining 20 MW of network extension will be supplied from the existing combined heat and power ("CHP") facility at Kosovo B where no increase in coal consumption is expected due to the operating characteristics of the plant and its use of baseload electricity production. A further 20 MW network extension for a total capacity of 70 MW will be considered at a later stage, subject to further due diligence including confirmation of Paris Agreement alignment. |
Original sector | Municipal Infrastructure |
Budget |
Location
Country | Kosovo |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT), Solar, Government, Commercial, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in Kosovo
- New Kosovo Power Plant
- Energy Sector Cleanup and Land Reclamation Project
- Lignite Power Technical Assistance Project
- Kosova e Re Thermal Power Plant
- Reconstruction of Kosovo A3 Coal Plant Unit
- Conservation and Development of the Archaeological Site of Dresnik - Klina
- AF - Clean-up & Land Reclamation Project
- Energy Sector Technical Assistance Project
