Great Falls (MT) Walmart Supercenter 7199-1005 SP
Sector: Power Generation (CCGT) • Location: Great Falls, Montana, United States of America
Source: Dodge USA
Existing Perimeter Walls To Remain. Ceiling Tile And Ceiling Grid To Remain, Unless Noted Otherwise . Existing Light Fixtures To Remain, Replace Nonworking Lamps, Clean Lenses. Add Power And Data. Clean Existing Hvac Diffusers And Grilles, Relocate As Indicated On Plans. Paint Interior Wall Finishes. Polish Existing Exposed Concrete Slab. Install Signage At Bulkhead, Patch And Repair Bulkhead And
- Status
- Closed
- Sector
- Power Generation (CCGT), Cement, Manufacturing (Industrial), Commercial
- Location
- Great Falls, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Great Falls (MT) Walmart Supercenter 7199-1005 SP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Existing Perimeter Walls To Remain. Ceiling Tile And Ceiling Grid To Remain, Unless Noted Otherwise . Existing Light Fixtures To Remain, Replace Nonworking Lamps, Clean Lenses. Add Power And Data. Clean Existing Hvac Diffusers And Grilles, Relocate As Indicated On Plans. Paint Interior Wall Finishes. Polish Existing Exposed Concrete Slab. Install Signage At Bulkhead, Patch And Repair Bulkhead And Paint As Needed. Install Walls, Equipment, Millwork, And Fixtures As Indicated On Plans. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Great Falls |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Cement, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
